Bus 4017 Project Management.. Instructor. F Pentney Wk 4/5, Supplement P. 5
|
# |
Task |
Duration days |
Predecessor |
Labour $ cost = |
Resources/ Materials |
Total costs |
|
A |
Erect forms- |
1 |
J |
$300 |
Disregard |
|
|
B |
Tradesmen |
- |
- |
|
This |
|
|
C |
Foundation |
- |
- |
|
Column |
|
|
D |
Floor joists |
2 |
G |
$600 |
For this |
|
|
E |
Site ready |
- |
- |
|
Case. |
|
|
F |
Build House |
- |
- |
|
|
|
|
G |
Remove forms |
1 |
O |
|
|
|
|
H |
Pegs for layout |
1 |
M |
|
|
|
|
I |
Electrical |
4 |
P |
|
|
|
|
J |
Excavate hole |
2 |
H |
|
|
|
|
K |
Plumbing |
5 |
P |
|
|
|
|
L |
Framing |
- |
- |
|
|
|
|
M |
Level lot |
1 |
None |
|
|
|
|
N |
Sub floor wood |
2 |
D |
|
|
|
|
O |
Pour concrete |
1 |
A |
|
|
|
|
P |
Studs for walls |
3 |
N |
|
|
|
Complete the WBS below to 2 LEVELS
To complete the above form start by identifying the name of the project, then the Summary tasks and finally the tasks related to the Summary tasks.
You can do this by using 3M stickies provided in class, or, organize by creating some headings (summary tasks) on a separate work sheet and then place related tasks under the headings. Create a WBS below with your results.
Name of Project/Title is your Top row.
Title does not count as a level.
Summary tasks are your first level
Work pages in this case are your second level.
Sometime the Summary tasks are broken down another level further
down before the work packages
|
|
|
|
|
|
|
|
|
|
F |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B |
|
|
|
C |
|
|
|
|
|
E |
|
|
|
L |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I |
K |
|
|
A |
O |
G |
|
|
|
H |
M |
J |
|
|
N |
p |
|
|
Note on the estimate portion for labor use $300 per
day. For materials just write in a best
guess-what type of house do you want?
Create a network diagram below between the squares. Show
the critical path. Length of critical path (time)
Remember only the work packages are scheduled on a
Network diagram not the Summary items.
Why, because the Network diagram only shows the Task
scheduling
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I |
|
|
Start |
|
M |
H |
J |
A |
O |
G |
D |
N |
P |
|
Finish |
|
|
|
|
|
|
|
|
|
|
|
|
K |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
![]()
|
GANTT chart - Info. come
from the WBS and the Network diagram |
|
|
Days |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
17 |
18 |
19 |
20 |
21 |
22 |
|
|
Tasks |
Person |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
F |
Build |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H |
|
|
v |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
J |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
O |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
P |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
K |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Show milestones-significant points in the project, but
not actual time durations-draw a diamond
![]()
![]()
Show
your Summary tasks with thicker lines and arrowheads